Is it possible to get a completion date estimate for the Bratoft area;
PE24 5DJ
PE24 5DL
PE24 5DN
PE24 5DA
PE34 5BZ

The fibre and cabinet were installed March 2018 and we have not heard anything

regards
Adrian
#2
Hi Adrian, I've just looked at roadworks.org and BT Openreach (via their contractor Telec) are doing lots of telecommunication works between Burgh Le Marsh and Bratoft in March 2019. The new Bratoft cabinet (Church Lane) is connected to a cabinet in Burgh Le Marsh. Hope this helps! Daniel
#3
Hi Daniel,
I never knew about that site, very interesting. Looks like they are coming back to fix blockages in the ducts 1 year after they started the work.

Adrian